Bill of Materials
A bill of materials is the list of every component, sub-assembly and raw material, with the quantity and unit of each, needed to make one stated quantity of a finished or semi-finished item.
Why it exists: Because making something is a recipe problem before it is a stock problem: someone has to say what goes in, and in what quantity, before material can be bought, reserved, issued or costed.
Where it sits
Bill of MaterialsThis document
Plan to produce: Bill of Materials → Work Order
Try it
What a production run needs from the store
Set the number of units. The table adds the raw materials of every level; a stocked sub-assembly stays one line.
A whole number, from 1 to 10,000.
Sample data, invented for this page. It is not a record from any system.
Raw materials for 100 units
| Item | Needed | Taken from |
|---|---|---|
| Copper winding (sample) | 40 kg | Motor assembly (sample) |
| Rotor (sample) | 100 pcs | Motor assembly (sample) |
| Bearing (sample) | 200 pcs | Motor assembly (sample) |
| Base casting (sample) | 100 pcs | Stand assembly (sample) |
| Pole tube (sample) | 100 pcs | Stand assembly (sample) |
| M4 screw (sample) | 1,200 pcs | Stand assembly (sample), Table fan (sample) |
| Blade (sample) | 300 pcs | Table fan (sample) |
| Carton (sample) | 100 pcs | Table fan (sample) |
How a bill of materials moves through its life
Four states. Pick one to see what a bill of materials is, and what it can still become.
Components and quantities are being set. A work order cannot use it.
Then: Active
Components and quantities are being set. A work order cannot use it.
Then: Active
Submitted and switched on. Work orders can use it, and one active BOM per item can be the default.
Then: Inactive
Submitted and switched on. Work orders can use it, and one active BOM per item can be the default.
Then: Inactive
Switched off but kept, so history stays readable. New work orders cannot pick it, and it cannot be switched off while another active BOM uses it as a sub-assembly.
Then: Cancelled
Switched off but kept, so history stays readable. New work orders cannot pick it, and it cannot be switched off while another active BOM uses it as a sub-assembly.
Then: Cancelled
Withdrawn. It is switched off and no longer the default. A corrected copy replaces it.
Ends here
Withdrawn. It is switched off and no longer the default. A corrected copy replaces it.
Ends here
Rules that must hold, and what breaks them
Rules
- A bill of materials describes how to make one stated quantity of one item. Component quantities scale with the quantity ordered, so the quantity on the BOM is part of the recipe.
- A BOM cannot contain its own finished item, directly or through a sub-assembly. The structure is a tree, and a loop would make the explosion endless.
- Only an approved, active BOM can drive production, and a changed recipe is a new version. The BOM that earlier orders were made from is not edited to match the new one.
Does this happen in your business?
Tick what you recognise. Each tick shows what it costs.
Tick any that happen here.
In ERPNext, and in your system
How ERPNext models it
| DocType | What it does here |
|---|---|
| BOM | Submittable. item, quantity (the output quantity), items (components), with_operations, is_active, is_default. Most fields lock on submit. is_active, is_default and the rate-source settings stay editable. Version 16 renames the scrap table Secondary Items and adds phantom BOMs. |
| BOM Item | One row per component: item_code, qty, uom, conversion_factor, source_warehouse, bom_no (the sub-assembly's own BOM) and do_not_explode. |
| BOM Explosion Item | The flat list of raw materials across all levels, rebuilt on save. Each sub-assembly's own list is scaled by the quantity needed, and equal items are added together. |
| BOM Update Tool | Runs Replace BOM and Update Cost as logged background jobs (BOM Update Log): swap one BOM for another wherever it is used, or refresh the cost of every BOM. |
What other systems call it
| System | Name | Note |
|---|---|---|
| ERPNext | BOM (Bill of Materials) | DocType BOM. |
| Tally | Bill of Materials (Set Components (BOM)) | Set on the stock item (Set Components (BOM) = Yes), with a BOM name such as Standard. An item can have several BoMs. The BoM is for items made in-house, not for trading items. |
| Zoho Books | Composite Items (Assembly type) | Zoho Inventory has no separate bill-of-materials record: an assembly composite item lists its components. Also in Zoho Books through the Zoho Inventory add-on. |
| SAP Business One | Bill of Materials | Production > Bill of Materials; multi-level, built one level at a time. Types: Production, Sales, Assembly and Template. |
| Odoo | Bill of Materials (BoM) | Manufacturing app. Multilevel BoMs have their own page in the same documentation. |
From each maker's own documentation, checked 13 October 2026. A dash: not confirmed.
Where a bill of materials connects
More terms it connects to
Each one opens that term.
Questions about bills of materials
The one most people ask is answered first. Type to find the rest.
What does a bill of materials mean for the business?
- A sub-assembly kept in stock, such as a motherboard made ahead of orders. The parent BOM should use it as a part and not explode it into raw materials, which ERPNext does with Do Not Explode on the component row.
- A product made in more than one way, such as a standard recipe and a customer-specific one. Each is a separate BOM for the same item, only one is the default, and the work order names the one it uses.
- Output that is not the finished good: by-products, co-products and scrap. ERPNext version 15 holds them as scrap items and version 16 as secondary items.
- A line that is a cost and not a material, such as a plating charge. It has to be kept out of stock movement, which ERPNext does by unticking Include Item in Manufacturing, so it costs the product without being issued from a warehouse.
Reviewed 14 October 2026. All 40 documents: the ERP glossary.