A machine breaks downa MithTech journey
The breakdown is logged, spares come from stock, and the history sits on the machine.
3 steps · Manufacturing · runs on the live ERPNext demo
Step by step
What happens at each step, and which record moves between which systems.
Step 1: The breakdown is logged
A machine stops on the floor, and the breakdown is logged with its downtime and cost.
Breakdown moves from Manufacturing to Maintenance.Step 2: Spares from the same stock
The spare parts come out of the same stock, so what the machine consumes is visible.
Spare parts moves from Stock to Maintenance.Step 3: History on the machine
The repair joins the machine's maintenance history on its own record, so you see the real problem machine.
Maintenance history moves from Maintenance to Assets.
More manufacturing
Work orders, job work, batch tracing and machine breakdowns.